![]() Risk can be presented in a risk matrix, with consequence along one axis and probability along the other axis. At UiB, these values are "life and health", "environment", "operation, production and service", "economic and material values", "credibility and reputation". We use probability as a measure of how likely we think it is that an (undesired) event will occur, based on the knowledge we have available.Ĭonsequence is a possible result of an undesired event, and can involve the loss of or damage to values we want to protect. These are based on templates from the Norwegian Labor Inspection Authority. Have routines for going to the emergency room.Īt UiB, we have prepared templates for HSE risk assessments (see Factbox) that can be used in the work with the HSE risk assessment.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |